Painted up the frame and legs. I took pictures of legs before and after painting so you can see how shitty they looked. After that, attached the legs and some legs supports to the outside of the frame. Pretty sturdy, but because the legs are designed to be canted out slightly, they don't sit flush up against the frame or supports (see close up picture). We'll be looking for someway to fill those gaps. Thought we might use shims to slide into that gap before screwing, but the shims would have split.
I had some trouble getting everything screwed in, so I went and bought a counter sink. Best purchase ever. Made things a million times easier. Boomslam.
Also, looks like my boy LB is going to be moving out to live with us. So pumped. Good thing we were ordering 5 power rings anyways.



No comments:
Post a Comment